PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work finihsed at the EMR Room 150A Facing South.jpg Cooper piping at the 1st floor bathroom 133-136 Facing North.jpg Erecting stone panels at the North Elevation 1.jpg Erecting stone panels at the North Elevation 2.jpg Installed damper controllers at the 1st floor Facing East.jpg Installed window frames at the 1st floor Attorneys Room Facing East.jpg Aligning the stone panels at the 2nd floor North Elevation.jpg Copper piping at the 2nd floor bathroom sinks Facing South.jpg Ductwork raiser at the 3rd floor Facing South-East.jpg
Previous pageNext page Installed damper controllers at the 1st floor Facing East
Installed damper controllers at the 1st floor Facing East